BROADWAY CHAMBERS
Contractor – Telford Homes
Architect – Stock Woolstencroft
Structural Engineer – PTA Consulting
Value –
Contract Period – 98 Weeks
Details – The project is located in the Stratford Conservation Area, surrounded by Grade II listed buildings, consisted of two tower blocks (15 and 36 storeys), rising from a shared podium, above a single storey underground car park.
The ground and mezzanine floors are a mixed‐use office / retail development, with the upper levels being utilised for residential.
The central stair cores/lift shafts were constructed with the Getjar’s own hybrid jump methodology. The floor slabs were cast traditionally, behind a safety screen, spanning 3 full floors.